Valero, on April 29, 2022, experienced a process upset on the 75,0000-barrel-per-day (BBL/d) fluid catalytic converter unit (FCCU) 1241, which remains shut for an unknown duration at its 395,000-BBL/d Port Arthur, Texas refinery. The FCCU 1241 had undergone a 61-day turnaround from January 13, 2022, to March 13, 2022.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!