SUGAR LAND--March 25, 2016--Researched by Industrial Info Resources (Sugar Land, Texas)--American Municipal Power Incorporated's (AMP) (Columbus, Ohio) 35-megawatt (MW) Willow Island hydroelectric facility, located in Pleasant County, West Virginia, began commercial operations this month. Within this article: Lists the construction manager as well as the engineering and design company for the project.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!