SUGAR LAND--March 25, 2016--Researched by Industrial Info Resources (Sugar Land, Texas)--American Municipal Power Incorporated's (AMP) (Columbus, Ohio) 35-megawatt (MW) Willow Island hydroelectric facility, located in Pleasant County, West Virginia, began commercial operations this month. Within this article: Lists the construction manager as well as the engineering and design company for the project.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!