Henan No.2 Thermal Power Construction Company (HTPC2) (Zhengzhou, Henan), a subsidiary of Power Construction Corporation of China (PCCC) (Beijing) began mechanical erection of first boiler steel beam for Unit 2 of China Resources Power Holdings Limited (Hong Kong)'s Panjin 700-megawatt (MW) Cogeneration Power Project on March 28, 2013.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!