Henan No.2 Thermal Power Construction Company (HTPC2) (Zhengzhou, Henan), a subsidiary of Power Construction Corporation of China (PCCC) (Beijing) began mechanical erection of first boiler steel beam for Unit 2 of China Resources Power Holdings Limited (Hong Kong)'s Panjin 700-megawatt (MW) Cogeneration Power Project on March 28, 2013.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!