Marathon Petroleum restarted the 225,000-BBL/d Pipe Still 3B (Crude) unit on November 17 at its 450,000-BBL/d Galveston Bay Refinery in Texas City, Texas, after the unit was shut for inspection on November 12. It had been shut from September 4 to September 7 due to issues with a transformer.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!