Valero will conduct a planned turnaround on the 54,000-BBL/d FCCU, 20,000-BBL/d HF Alky, 64,000-BBL/d Gas Oil Hydrotreater (Heavy Gas Oil) and the SRU 2 on January 17 at its 80,000-BBL/d Wilmington refinery in California. The event is expected to be completed by February 9.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!