Motiva Enterprises, on August 6, restarted the 195,000-barrel-per-day (BBL/d) Crude Vacuum Pipe Still (VPS) 4 and the 80,000-BBL/d VPS-2 at its 600,000-BBL/d Port Arthur, Texas, refinery, after the units shut down on August 5 due to a power blip.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.