Phillips 66 will shut down the 30,000-BBL/d FCCU 40 on April 23 for a planned 28-day turnaround at its 145,000-BBL/d Borger, Texas, refinery; this event previously was planned to start May 1. The crude units will be slightly reduced during this turnaround.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.