Marathon restarted the 140,000-BBL/d FCCU 3 and 31,500-BBL/d HF Alky 3, on April 27, at its 437,000-BBL/d Galveston Bay Refinery in Texas City, Texas. The FCCU 3 was shut on February 22, and the HF Alky 3 was shut on April 2. The units previously were expected to restart on April 23.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!