Bharat Petroleum Corporation Limited (BPCL) resumed full throughput at its 320,000-BBL/d Kochi Refinery in India on December 18. The IREP block, which includes seven major units, was operating at 91% since November 24.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.