ExxonMobil restarted the 120,000-BBL/d FCCU today, October 26, at its 350,000-BBL/d Beaumont, Texas, refinery after it was shut down on October 23 due to an upset. Separately, the 40,000-BBL/d CHD-2 ULSD Diesel Hydrotreater was restarted on October 25 after it was shut down on October 6.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!