METRO MANILA--April 30, 2025--Researched by Industrial Info Resources (Sugar Land, Texas)--Inpex Masela Ltd, a subsidiary of Inpex Corporation (Tokyo, Japan), is set to commence the front-end engineering design (FEED) phase for its onshore Abadi LNG project in Indonesia. The company has announced the opening of the tender process for the selection of liquefaction and gas turbine technologies. This multi-billion-dollar liquefied natural gas (LNG) project, with a planned capacity of 9.5 million tonnes per annum (MTPA), is expected to officially enter the FEED stage by mid-2025.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!