September 24, 2025--Researched by Industrial Info Resources (Sugar Land, Texas)--In the latest development in President Donald Trump's battle against offshore wind projects, a judge has lifted the stop-work order for the construction of the Revolution windfarm off the coast of Rhode Island, which was 80% complete at the time of the administration's directive.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!