BEIJING--March 26, 2014--Researched by Industrial Info Resources China (Beijing, China)--China No.15 Metallurgical Construction Group Company Limited (15MCC) (Huangshi, Hubei) kicked off the main powerhouse excavation for CPI Ningxia Qingtongxia Energy Aluminum Group Company Limited's (Yinchuan, Ningxia) 700-megawatt (MW), coal-fired Zhongwei Cogeneration Project on March 20, 2014.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!