July 6, 2023--Written by John Egan for Industrial Info Resources (Sugar Land, Texas)--Good things are worth waiting for. That was the essence of comments at the June 20 groundbreaking ceremony for the $3 billion, 3,000-megawatt (MW) TransWest Express (TWE) transmission project, which will bring Wyoming windpower to Utah, Nevada, Arizona and Southern California.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!