Pan American Energy (PAE), owner of Axion Energy, continues with the commissioning of a 50,000-barrel-per-day (BBL/d) delayed coker unit as part of the expansion of its 95,000-barrel-per-day (BBL/d) Campana Refinery in Argentina. Axion indicates that the commissioning phase will conclude by the end of November and the unit might be up and running by early to mid-December. The refinery continues to run at approximately 80-90% capacity.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!