Join us on April 30th for our 2025 Global Food & Beverage Project Spending Outlook! RSVP Today!
Sales & Support: +1 800 762 3361
Member Resources
Rhode Island Power Project has Plenty of Opposition, No Water

SUGAR LAND--September 28, 2016--Written by John Egan for Industrial Info Resources (Sugar Land, Texas)--A proposed, natural gas-fired generating station in Rhode Island has drawn heavy local opposition and has twice failed to secure a source of water, casting doubt on its potential to move forward. The two-unit, 900-megawatt (MW) Clear Water Energy Center is being developed by Invenergy LLC (Chicago, Illinois). Within this article: Details on the obstacles facing the Clean Water Energy Center and the latest efforts to get it off the ground.

Login or Register for Instant Access

Subscribe Now!

(All Fields Required)

IIR Logo Globe

Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.

×
×
Contact Us

For More Info!