GALWAY, IRELAND--July 27, 2017--Written by Martin Lynch, European News Editor for Industrial Info (Galway, Ireland)--With the commissioning of the 288-megawatt (MW) Sandbank offshore windfarm, Germany is set to achieve its goal of having 6.5 gigawatts (GW) of grid-connected offshore wind power by 2020. Within this article: Details Sandbank offshore inauguration, project costs, related projects and German wind energy targets
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!