September 25, 2025--Written by Paul Wiseman for Industrial Info Resources (Sugar Land, Texas)--Australia's Santos Limited (Adelaide) this week announced that the BW Offshore-built BW Opal FPSO (floating production, storage and offloading vessel) at the Barossa gas field development project received first gas, to commence production operations. Santos's Barossa joint venture partners are PRISM Energy Australia (Perth, Australia) (37.5%) and Japan-based JERA Australia (12.5%).
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!