Dominion Nuclear Connecticut Incorporated's 909.9-megawatt (MW) Millstone 02 unit at its Millstone Nuclear Power Station in Connecticut is holding at 86% due to a supply check valve failure on an auxiliary feedwater pump.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.