Marathon, on March 11, will start a 35-day planned maintenance turnaround of the 60,000-barrel-per-day (BBL/d) Crude 2 Unit, 104,000-BBL/d Fluid Catalytic Cracking Unit (FCCU) and 13,000-BBL/d Alkylation (Alky) Unit at its 261,000-BBL/d Los Angeles Carson Refinery in California.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!