Phillips 66, on March 19, shut down the 30,000-barrel-per-day (BBL/d) Fluid Catalytic Cracker Unit (FCCU) 40 and FCCU 26 (Fractionation) unit at its 145,000-BBL/d refinery in Borger, Texas, for 47 days, and also the 34,000-BBL/d Naphtha HDS 19-1 and 20,000-BBL/d Reformer 19.2 for 18 days. On March 17, Phillips 66 shut down four units for about two to three weeks.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!