Consumer Co-Operative Refineries, on April 15, will begin a 45-day planned maintenance turnaround of the 26,000-barrel-per-day (BBL/d) Fluid Catalytic Cracker Unit (FCCU), 10,000-BBL/d Delayed Coker and 22,000-BBL/d Gasoline Hydrotreater at its 130,000-BBL/d refinery in Regina, Saskatchewan.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!