Irving Oil, on May 13, began a 45-day planned maintenance turnaround of the 25,000-barrel-per-day (BBL/d) Fluid Catalytic Cracker Unit (FCCU) 25 (old) and 8,000-BBL/d Sulfuric Alkylation (SF Alky) 32 (old) Unit at its 300,000-BBL/d refinery in Saint John, New Brunswick.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!