Motiva, on August 30, shut down the 81,000-barrel-per-day (BBL/d) Fluid Catalytic Cracker Unit (FCCU) 3 for unplanned repairs at its 640,000-BBL/d refinery in Port Arthur, Texas. The cause is unknown at this time, but plant personnel hope to have the unit back online by this weekend.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!