Valero, on November 14, shut down the 76,000-barrel-per-day (BBL/d) Fluid Catalytic Cracker Unit (FCCU) for minor repairs at its 170,000-BBL/d McKee Refinery in Sunray, Texas. The unit is expected to start back up on November 17.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.