Marathon continues with repairs to the 134,000-barrel-per-day (BBL/d) Fluid Catalytic Cracker Unit (FCCU) 25 at its 530,000-BBL/d refinery in Garyville, Louisiana, due to a major mechanical failure. The restart date is unknown but plant personnel expect repairs to continue through the remainder of the year.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!