vPhillips 66 continues with an unplanned shutdown of the 30,000-barrel-per-day (BBL/d) Fluid Catalytic Cracking Unit (FCCU) 40 at its 146,000-BBL/d refinery in Borger, Texas. Although an actual restart date is not known, the unit is expected to be down until at least mid-May.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!