Valero, on February 23, shut down the 77,000-barrel-per-day (BBL/d) Fluid Catalytic Cracking Unit (FCCU) at its 144,000-BBL/d refinery in Benicia, California due to operational issues. The shutdown is expected to advance plans for a previously reported turnaround scheduled for September 2025.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!