As the 2014 dateline on raw metal ore export ban draws closer, Bumi Resources Tbk (BUMI.JK) is planning to build a $1.5 billion polymetallic smelter in Medan, South Sulawesi, Indonesia. This is to guarantee the smelting of metal concentrates expected from a planned underground lead-zinc-silver mine being developed by its 80% subsidiary, PT Dairi Prima Mineral (DPM).
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!