Check out our latest podcast episode on global oil & gas investments. Watch now!
Sales & Support: +1 800 762 3361
Member Resources
Industrial Info Resources Logo
Global Market Intelligence Constantly Updated Your Trusted Data Source for Industrial & Energy Market Intelligence
Home Page

Advanced Search


Released May 22, 2019 | SUGAR LAND
en
Royal Vopak's Rotterdam Gate LNG Receiving and Regasification Terminal was operating at nearly full sendout capacity of 1.16 billion standard cubic feet per day throughout April 2019, a result of curbed gas production at the massive Groningen Field.

The reduced production at Groningen is a result of earthquakes that are believed to have been caused by production activity, as well as relatively high injection rates at Dutch gas-storage sites. See map below.

Attachment
IIR Logo Globe

Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.

×
×

Contact Us

For More Info!