Hydrocarbon Storage Terminal (HST) SAPI de CV. plans to construct five refined products terminals for storage and distribution, which will include tank leasing opportunities, in Mexico. The terminals will be located in Sonora, Colima, Puebla, Valle de Mexico and Veracruz, with a total storage capacity at each terminal ranging between 350,000 and 560,000 barrels. The company plans to have all five terminals operational by 2023.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!