IIR Energy Top Refining News Today: January 6th 2020
Phillips 66 restarted the 50,000-BBL/d FCCU and the 27,500-BBL/d Unicracker 120 units on January 5 at its 133,000-BBL/d Los Angeles, Wilmington, refinery, after they were shut down due to a fire in a boiler area on December 25.
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.