July 31, 2025--Researched by Industrial Info Resources (Sugar Land, Texas)--Apex Clean Energy (Charlottesville, Virginia) recently announced that it brought 625 megawatts (MW) of wind power and battery energy storage systems (BESS) online in the first half of 2025 in projects spanning Maine, Illinois and Texas. Industrial Info is tracking several more planned Apex projects across the U.S.; however, legislative and permitting headwinds may present a challenge to the development of some of these.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!