Raizen is restarting its 93,000-barrel-per-day (BBL/d) Buenos Aires Refinery in Dock Sud, following an uptick in demand. Raizen had shut down the refinery on April 17 as a result of falling demand due to COVID-19 restrictions. The lifting of some of those restrictions prompted Raizen to resume operations.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!