Raizen is restarting its 93,000-barrel-per-day (BBL/d) Buenos Aires Refinery in Dock Sud, following an uptick in demand. Raizen had shut down the refinery on April 17 as a result of falling demand due to COVID-19 restrictions. The lifting of some of those restrictions prompted Raizen to resume operations.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!