Nizhnekamskneftekhim PJSC has picked Haldor Topsoe as the technology provider for a planned 500,000-metric-ton-per-year methanol unit (see image below), located in Nizhnekamsk, Tatarstan, Russia. JSC NIIK has signed for design and engineering services for the $300 million project.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!