Indonesia aims to increase the electrification ratio in its East Nusa Tenggara (Nusa Tenggara Timur) province through the accelerated development of geothermal-sourced power generation. The Research & Development and Geological agencies of the Ministry of Energy and Mineral Resources have signed a memorandum of understanding (MoU) with PT PLN (Persero) to drill production wells for the planned Marana Geothermal Power Station.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!