July 25, 2024--Researched by Industrial Info Resources (Sugar Land, Texas)--India is moving steadily along with its goal of making natural gas a 20% share of its energy mix by 2030. As a part of this, Indradhanush Gas Grid (Assam, India) is underway with the construction of the 1,656-kilometer North East Gas Grid pipeline, which is expected to be completed by 2025.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!