GALWAY, IRELAND--May 20, 2020--Written by Martin Lynch, European News Editor for Industrial Info (Galway, Ireland)--As drilling activity in the North Sea remains depressed due to the COVID-19 pandemic it was full steam ahead at the Nova development where Neptune Energy and Wintershall DEA have completed the lift of the 740-tonne topside module. Within this article: Details platform installation, project development, timeline estimated yield, investment and future field connections
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×For More Info!