GALWAY, IRELAND--May 20, 2020--Written by Martin Lynch, European News Editor for Industrial Info (Galway, Ireland)--As drilling activity in the North Sea remains depressed due to the COVID-19 pandemic it was full steam ahead at the Nova development where Neptune Energy and Wintershall DEA have completed the lift of the 740-tonne topside module. Within this article: Details platform installation, project development, timeline estimated yield, investment and future field connections
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!