Taiwan Power Company (Taipower) has started a 25-year nuclear decommissioning program, divided into four phases: Post-Operation Transition, Decommissioning and Dismantling, Final Site Radiation Survey, and Site Recovery. Taipower also has formulated strict environmental protection measures and various safety assessment plans to ensure the safety of the public.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!