Flint Hills, on March 13, shut down the 58,000-barrel-per-day (BBL/d) Continuous Catalytic Reformer in the West Complex of its 300,000-BBL/d refinery in Corpus Christi, Texas, due to a leak. The cause and shutdown duration are unknown at this time, and the company is investigating any required repairs.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!