Phillips 66 plans to restart two units at its 146,000-barrel-per-day (BBL/d) refinery in Borger, Texas in December: the 30,000-BBL/d Fluid Catalytic Cracker Unit (FCCU) 40 will restart in the first week of the month and the 30,000-BBL/d FCCU 29 will restart around mid-December.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!