Abstract GALWAY, IRELAND--September 26, 2017--Written by Martin Lynch, European News Editor for Industrial Info (Galway, Ireland)--The interconnection of Europe's electricity grids continues to advance rapidly with the start of cable laying operations for the first power link between Belgium and the U.K. Within this article: Details first power link between U.K. and Belgium, capacity, timeline, partners and related interconnector projects
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!