Reports related to this article:
Project(s): View 5 related projects in PECWeb
Released December 31, 2020 | CORDOBA, ARGENTINA
en
Petroleos Brasileiros SA (Petrobras), along with Doris Engenharia LTDA, is performing basic engineering for a generic floating production, storage and offloading (FPSO) prototype to be used for the installation of four new production units in the Santos Basin Pre-salt area, Buzios 9, Buzios 10, Buzios 11 and Buzios 12.
With the installation of these units, Petrobras expects to reach massive development of the field, which currently has four operational FPSO units. Almirante Barroso (MV32) is under construction, and seven units are planned to be deployed between 2024 and 2026.
Industrial Info is tracking $11 billion of investments in Petrobras's active projects to develop the Pre-Salt Buzios field in Santos Basin. Click here for a list and see map below.
With the installation of these units, Petrobras expects to reach massive development of the field, which currently has four operational FPSO units. Almirante Barroso (MV32) is under construction, and seven units are planned to be deployed between 2024 and 2026.
Industrial Info is tracking $11 billion of investments in Petrobras's active projects to develop the Pre-Salt Buzios field in Santos Basin. Click here for a list and see map below.