Marathon restarted units at its 167,000-BBL/d Martinez, California, refinery on Wednesday that were shut down on October 15 following a 4.5-level earthquake. Units affected were the 30,000-BBL/d Hydrocracker, 40,000-BBL/d HDS 2 Diesel (ULSD), 23,000-BBL/d Reformer 3 CCR and 15,000-BBL/d SF Alky.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!