Marathon restarted units at its 167,000-BBL/d Martinez, California, refinery on Wednesday that were shut down on October 15 following a 4.5-level earthquake. Units affected were the 30,000-BBL/d Hydrocracker, 40,000-BBL/d HDS 2 Diesel (ULSD), 23,000-BBL/d Reformer 3 CCR and 15,000-BBL/d SF Alky.
(All Fields Required)
Site-wide Scheduled Maintenance for September 27, 2025 from 12 P.M. to 6 P.M. CDT. Expect intermittent web site availability during this time period.
×Contact Us
For More Info!