Houston Refining LP (LyondellBasell) is continuing with repairs after being forced to shut down the 90,000-BBL/d fluid catalytic cracking (FCCU) 732 unit, on February 16, at its 265,000-BBL/d Houston, Texas, refinery, due to a leak which caused a fire. The duration for repairs is unknown at this time.
(All Fields Required)
Site-wide Scheduled Maintenance for April 12, 2025, between 9 A.M. - 9 P.M. CST. During this time, all services will be unavailable periodically throughout the scheduled maintenance window.
×Contact Us
For More Info!