Albanesi Subsidiary to Add 120 Megawatts to Modesto Maranzana Thermo Plant in Argentina

Albanesi Subsidiary to Add 120 Megawatts to Modesto Maranzana Thermo Plant in Argentina

Albanesi Subsidiary to Add 120 Megawatts to Modesto Maranzana Thermo Plant in Argentina

CORDOBA, ARGENTINA--July 1, 2008--Researched by Industrial Info Resources (Sugar Land, Texas)--Argentina's Generacion Mediterranea S.A. is in the final stage of a turbine assembly in order to add 120 megawatts (MW) to the Modesto Maranzana Power Station. Two units from Pratt & Whitney Power Systems (East Hartford, Connecticut), a United Technologies Corporation (NYSE:UTX) (Hartford, Connecticut)company, will be installed at the station. The gas turbines will then be converted to combined-cycle mode, along with the existing General Electric (NYSE:GE) (Fairfield, Connecticut) steam turbines.

Subscribe Now!(All Fields Required)

Standard Membership - Free

All Members Receive the Following Resources:

  • Industry News Digest
  • Upcoming Webinars
  • On-Demand Webinars
  • The NavigatIIR Newsletter
  • Economic Indicators