SUGAR LAND--May 14, 2015--Written by John Egan for Industrial Info Resources (Sugar Land, Texas)--Colorado Springs Utilities (CSU) (Colorado Springs, Colorado) has awarded engineering, procurement and construction (EPC) contracts to Babcock & Wilcox (NYSE:BWC) (B&W) (Charlotte, North Carolina) and The Perry Group Limited (Wadsworth, Ohio) to install pollution-control equipment at the Ray D. Nixon Power Station's coal-fired unit. B&W will design, manufacture and construct a dry absorber to reduce sulfur dioxide (SO2) emissions at the coal-fired boiler of the 35-year-old plant.
Within this article: Update on installation of pollution-control equipment at the Ray D. Nixon Power Station by Colorado Springs Utilities.
(All Fields Required)