BEIJING--July 17, 2013--Researched by Industrial Info Resources China (Beijing, China)--Fujian Electric Power Design Institute (FEPDI) (Fuzhou, Fujian) and East China Electric Power Design Institute (ECEPDI) (Shanghai) jointly signed the survey and engineering contract for the 2,000-megawatt (MW) Huadian Kemen Power Plant Phase III expansion project with Huadian Fujian Kemen Power Generation Company Limited (Fuzhou, Fujian) on July 9, 2013.
(All Fields Required)